Square Feet to Yards of Concrete Calculator

Square Feet to Yards of Concrete Calculator

#8 · Industry-Specific AI Skill PRO

Enter Calculation

Used only with Custom thickness.

Formula

Yards=Area (ft2)×Thickness (in)1227\text{Yards} = \frac{{{\text{Area (ft}^2\text{)}}} \times \dfrac{\text{Thickness (in)}}{12}}{27}

Example

Yards=100×51227≈1.54\text{Yards} = \frac{100 \times \dfrac{5}{12}}{27} \approx 1.54
Usage stats

Advertisement

Results

Concrete Needed
1.54
cubic yards
Volume (cubic feet) 41.67 ft³
With 10% waste allowance 1.7 yd³
Thickness used (inches) 5

Report an error on this page

What This Calculator Does

Concrete is sold by the cubic yard, but slabs, patios, driveways and footings are measured in square feet. This calculator bridges that gap: enter the surface area in square feet and the slab thickness in inches, and it returns the number of cubic yards of concrete you need to order.

How to Use It

Measure the length and width of the area in feet and multiply them to get square feet. Enter that value, then enter the slab thickness in inches (4 inches is typical for patios and walkways, 6 inches for driveways). The result shows the raw cubic yards plus a version with a 10% waste allowance for spillage, uneven subgrade and over-excavation.

The Formula

Concrete volume is computed in three steps. First, convert thickness from inches to feet by dividing by 12. Multiply by the area to get cubic feet. Finally divide by 27 (there are 27 cubic feet in a cubic yard):

$$\text{Yards} = \frac{\text{Area (ft}^2\text{)} \times \dfrac{\text{Thickness (in)}}{12}}{27}$$

Advertisement
Isometric diagram of a concrete slab showing length, width, and thickness dimensions
Concrete volume comes from the slab area multiplied by its thickness.

Worked Example

Suppose you are pouring a 100 ft² patio at 4 inches thick. Thickness in feet = \(4 \div 12 = 0.333\) ft. Cubic feet = \(100 \times 0.333 = 33.33\) ft³. Cubic yards = \(33.33 \div 27 = 1.23\) yd³. Adding 10% waste gives about 1.36 yd³, so you would order 1.5 yards from the ready-mix supplier.

Flat infographic showing conversion from square feet and inch thickness to cubic yards
Thickness in inches is divided by 12, then total cubic feet divided by 27 gives cubic yards.

Square Feet Covered per Cubic Yard by Slab Thickness

A cubic yard holds 27 cubic feet. That is 27 × 12 = 324 square feet of concrete one inch thick. To find how much area one cubic yard covers, divide 324 by the slab thickness in inches. To go the other way and get cubic yards per 100 ft², multiply 100 by the thickness and divide by 324:

$$\text{Coverage (ft}^2\text{ per yd}^3\text{)} = \frac{324}{t} \qquad \text{Yards per 100 ft}^2 = \frac{100 \times t}{324}$$

Here \(t\) is the thickness in inches. The figures below are exact volumes and do not include the 10% waste allowance.

Thickness (in) ft² covered by 1 yd³ yd³ per 100 ft² Typical use
3 108 0.93 Light, non-structural pads and thin toppings. This is thinner than the usual 4" for slabs on grade.
3.5 92.6 1.08 Light pads and paths formed with 2×4 lumber, which actually measures 3.5" deep
4 81 1.23 Patios, walkways and sidewalks
5 64.8 1.54 Driveways, garage floors and shed pads
6 54 1.85 Driveways and garage floors that carry heavier vehicles
8 40.5 2.47 Heavy-duty slabs for trucks, RVs or equipment

The uses listed are general rules of thumb. The thickness you actually need depends on the load, the soil and subbase, any reinforcement, and local building codes, so check what applies where you live.

Advertisement

More Worked Examples

Both examples use the same formula. Convert the thickness from inches to feet by dividing by 12, multiply by the area to get cubic feet, then divide by 27 to get cubic yards. Add 10% for waste, spillage and an uneven subgrade. Then round up, because suppliers deliver in quarter-yard or half-yard steps.

Example 1: 12 ft × 24 ft driveway, 6 inches thick

  1. Area: \(12 \times 24 = 288\) ft²
  2. Thickness in feet: \(6 \div 12 = 0.5\) ft
  3. Volume: \(288 \times 0.5 = 144\) ft³
  4. Cubic yards: \(144 \div 27 = 5.33\) yd³ (5.33 yd³)
  5. Add 10% waste: \(5.33 \times 1.10 = 5.87\) yd³
  6. Round up to a delivery step: order 6 yd³
$$\text{Yards} = \frac{288 \times \frac{6}{12}}{27} = \frac{144}{27} = 5.33 \;\rightarrow\; 5.33 \times 1.10 = 5.87 \;\rightarrow\; 6\ \text{yd}^3$$

Example 2: 10 ft × 10 ft shed pad, 5 inches thick

  1. Area: \(10 \times 10 = 100\) ft²
  2. Thickness in feet: \(5 \div 12 = 0.4167\) ft
  3. Volume: \(100 \times 0.4167 = 41.67\) ft³
  4. Cubic yards: \(41.67 \div 27 = 1.54\) yd³ (1.54 yd³)
  5. Add 10% waste: \(1.54 \times 1.10 = 1.70\) yd³
  6. Round up to the next quarter yard: order 1.75 yd³
$$\text{Yards} = \frac{100 \times \frac{5}{12}}{27} = \frac{41.67}{27} = 1.54 \;\rightarrow\; 1.54 \times 1.10 = 1.70 \;\rightarrow\; 1.75\ \text{yd}^3$$

Round up, not down. Running short in the middle of a pour can leave a cold joint in the slab. Some ready-mix suppliers have a minimum order or charge extra for small loads, so ask about this before you order a small amount like the shed pad.

FAQ

Why add a waste allowance? Subgrade is rarely perfectly level and some concrete is always lost to spillage and form leakage, so ordering 5–10% extra avoids running short mid-pour.

How thick should my slab be? Sidewalks and patios are usually 4 inches; driveways and garage floors 5–6 inches. Always follow local building codes.

Can I round my order? Yes — suppliers deliver in quarter- or half-yard increments, so round up to the next available amount.

Sources & References

Last updated:

Most popular in Industry-Specific

View all Industry-Specific calculators