Factorio Production Ratio Calculator

Factorio Production Ratio Calculator

Leading AI Skill PRO

Enter Calculation

Formula

N=⌈T·t60·s·E⌉Belt load=T60·B×100Ingredients/min=TE·Iwhere{T=Target (items/min)t=Recipe time (s)s=Crafting speedE=Items per craft·(1+Productivity bonus100)I=Ingredients per craftB=Belt speed (items/s)\begin{gathered} N = \left\lceil \frac{T \cdot t}{60 \cdot s \cdot E} \right\rceil \\[0.8em] \text{Belt load} = \frac{T}{60 \cdot B} \times 100 \qquad \text{Ingredients/min} = \frac{T}{E} \cdot I \\[1.5em] \text{where}\quad \left\{ \begin{aligned} T &= \text{Target (items/min)} \\ t &= \text{Recipe time (s)} \\ s &= \text{Crafting speed} \\ E &= \text{Items per craft} \cdot \left(1 + \frac{\text{Productivity bonus}}{100}\right) \\ I &= \text{Ingredients per craft} \\ B &= \text{Belt speed (items/s)} \end{aligned} \right. \end{gathered}
Usage stats

Advertisement

Results

Machines needed (rounded up)
1
assemblers or furnaces
Exact machines required 0.67
Output per machine (items/min) 90
Actual output with whole machines (items/min) 90
Ingredient consumption (items/min) 120
Belt capacity used (%) 6.67
Machine utilization (%) 66.67

Report an error on this page

What is a Factorio production ratio?

In Factorio, every recipe takes a fixed number of seconds to craft at crafting speed 1. A production ratio tells you how many machines you must build so that output matches the demand of the factory. This calculator converts a target rate in items per minute into a machine count and also shows the belt capacity used.

Several assemblers feeding an output conveyor belt with items
Several assemblers working in parallel to supply one output belt.

How to use the calculator

Enter the target rate, the recipe time from the in-game tooltip, and the number of items produced per craft. Then set the crafting speed of your machine (for example 0.75 for an assembling machine 2, 1.25 for an assembling machine 3, 1 for a stone or steel furnace of the matching speed) and any productivity bonus from modules. Finally choose a belt type to see how much of a belt the output fills.

The formula explained

The number of machines is:

$$N = \frac{T}{60 \times O \times (1+p)} \times \frac{t}{s}$$

Here \(T\) is the target in items per minute, \(O\) the items per craft, \(p\) the productivity bonus as a fraction, \(t\) the recipe time in seconds and \(s\) the crafting speed. The first fraction is crafts per second; multiplying by \(t/s\) gives the machines kept busy. Because you cannot build part of a machine, the result is rounded up.

Advertisement
Diagram linking recipe time, crafting speed and productivity to the number of assemblers
Recipe time, crafting speed and productivity together determine how many machines you need.

Worked example

Suppose you want 120 iron plates per minute from stone furnaces (recipe time 3.2 s, speed 1, one plate per craft, no productivity).

$$N = \frac{120}{60 \times 1 \times 1} \times \frac{3.2}{1} = 2 \times 3.2 = 6.4$$

Rounded up this is 7 furnaces, which produce \(7 \times 18.75 = 131.25\) plates per minute. Utilization is \(6.4 / 7 \approx 91.4\%\), and the output uses \(2/15 \approx 13.3\%\) of a yellow belt.

Conveyor belt partially filled with a load gauge below
Belt load shows how much of a belt's capacity your target rate uses.

Crafting Speeds of Assemblers and Furnaces

The crafting speed \(s\) in the formula is a multiplier on recipe time: a machine with speed 2 finishes a recipe in half the listed time. The values below are for vanilla Factorio 1.1.

Machine Crafting speed Module slots
Assembling machine 1 0.5 0
Assembling machine 2 0.75 2
Assembling machine 3 1.25 4
Stone furnace 1 0
Steel furnace 2 0
Electric furnace 2 2
Chemical plant 1 3
Oil refinery 1 3

Productivity modules

Module Productivity bonus Speed penalty
Productivity module 1 +4% −5%
Productivity module 2 +6% −10%
Productivity module 3 +10% −15%

Bonuses and penalties add up across slots. For example, an assembling machine 3 with four productivity module 3 has +40% productivity and −60% speed, so its effective crafting speed is \(1.25 \times (1 - 0.60) = 0.5\). Enter this effective speed in the Crafting speed field and the total bonus (here 40) in the Productivity bonus field.

Note: these values apply to vanilla Factorio 1.1. Mods, and Factorio version 2.0, may change crafting speeds, module effects and slot counts, so check your own version. Productivity modules can also only be used in certain recipes (mainly intermediate products).

Advertisement

Comparing Machine Setups for the Same Target

The machine count is \(N = \left\lceil \frac{T}{60 \cdot O \cdot (1+p)} \cdot \frac{t}{s} \right\rceil\), where \(O\) is the items per craft and \(p\) is the productivity bonus as a fraction. Utilization is the unrounded count divided by the rounded count. Belt load is \(T/(60B)\); a target of 900/min is 15 items/s, which fills a yellow belt (15 items/s) completely, loads a red belt (30 items/s) to 50% and a blue belt (45 items/s) to 33.3%.

Example 1: 900 iron plates/min (recipe time 3.2 s, 1 plate per craft)

Setup Effective speed Productivity Calculation Machines Utilization Belt load (yellow)
Stone furnace 1 0% \(\frac{900 \cdot 3.2}{60 \cdot 1} = 48\) 48 100% 100%
Steel or electric furnace 2 0% \(\frac{900 \cdot 3.2}{60 \cdot 2} = 24\) 24 100% 100%
Electric furnace, 2× productivity module 1 (hypothetical) \(2 \times 0.90 = 1.8\) +8% \(\frac{2880}{60 \cdot 1.8 \cdot 1.08} \approx 24.69\) 25 98.8% 100%
Electric furnace, 2× productivity module 3 (hypothetical) \(2 \times 0.70 = 1.4\) +20% \(\frac{2880}{60 \cdot 1.4 \cdot 1.2} \approx 28.57\) 29 98.5% 100%

The productivity rows are hypothetical. They show the arithmetic, and whether productivity modules are allowed in a given recipe depends on your game version and mods. Productivity cuts ingredient use: 900 plates/min needs 900 ore/min at 0%, about 833 ore/min at +8%, and 750 ore/min at +20% (\(900/1.2\)). Productivity does not change the output belt load, because the target stays 900/min.

Example 2: 900 electronic circuits/min (recipe time 0.5 s, 1 per craft)

Here \(\frac{T \cdot t}{60} = \frac{900 \cdot 0.5}{60} = 7.5\), so \(N = 7.5 / (s \cdot (1+p))\).

Setup Effective speed Productivity Calculation Machines Utilization Belt load (yellow)
Assembling machine 1 0.5 0% \(7.5 / 0.5 = 15\) 15 100% 100%
Assembling machine 2 0.75 0% \(7.5 / 0.75 = 10\) 10 100% 100%
Assembling machine 3 1.25 0% \(7.5 / 1.25 = \)6 6 100% 100%
Assembling machine 3, 4× productivity module 3 \(1.25 \times 0.40 = 0.5\) +40% \(7.5 / (0.5 \cdot 1.4) \approx 10.71\) 11 97.4% 100%

The last row shows the trade-off. Four productivity module 3 cut input consumption to \(1/1.4 \approx 71.4\%\) (for example about 643 iron plates/min instead of 900, with 1 plate per craft), but the −60% speed penalty nearly doubles the machine count compared with plain AM3 (11 instead of 6). If you forgot the penalty and used speed 1.25 with +40%, you would get \(7.5/(1.25 \cdot 1.4) \approx 4.29\), or 5 machines, which is too few to meet the target.

FAQ

Does productivity reduce ingredients?

No. Productivity gives free extra output per craft, so each craft still consumes the same ingredients, but you need fewer crafts for the same target.

Why is utilization below 100%?

Rounding up to whole machines leaves spare capacity, so the last machine is not fully busy.

Are belt throughputs exact?

The calculator uses the standard vanilla values of 15, 30 and 45 items per second for yellow, red and blue belts (both lanes).

Last updated:

Most popular in Hobby and Craft

View all Hobby and Craft calculators