What is the two-worker time together calculator?
This calculator solves the classic "work rate" word problem: if one worker can finish a job alone in a hours and another can finish the same job alone in b hours, how long will it take them to complete the job working together? The answer comes from combining their rates.
How to use it
Enter the time each worker needs to complete the job on their own. Worker A might paint a fence in 4 hours and Worker B in 6 hours. Press calculate and the tool returns the combined time plus each individual rate and the combined rate (jobs per hour).
The formula explained
Each worker contributes a fraction of the job per hour. Worker A does \(1/a\) of the job each hour, Worker B does \(1/b\). Together their combined rate is \(1/a + 1/b\), which equals \(1/t\). Rearranging gives the convenient closed form:
$$t = \frac{a \cdot b}{a + b}$$
Because the combined rate is the sum of the parts, two people always finish faster than either alone.
Worked example
Suppose A takes 4 hours and B takes 6 hours. Then $$t = \frac{4 \times 6}{4 + 6} = \frac{24}{10} = 2.4 \text{ hours}.$$ So together they finish in 2 hours and 24 minutes — faster than the quicker worker on their own.
More Worked Examples
Each example uses the combined-rate idea: a worker who finishes a job in \(a\) hours does \(1/a\) of the job per hour. Rates add, so the together-time is \(t = \frac{ab}{a+b}\).
Example 1: Two equal workers (a = b = 6)
- Rate of A: \(1/6\) job per hour. Rate of B: \(1/6\) job per hour.
- Combined rate: \(\frac{1}{6}+\frac{1}{6}=\frac{2}{6}=\frac{1}{3}\) job per hour.
- Time: \(t = \frac{6 \times 6}{6+6}=\frac{36}{12}=\)3 hours.
Two identical workers take exactly half the time of one worker.
Example 2: Very unequal workers (a = 2, b = 20)
- Rate of A: \(1/2 = 0.5\) job per hour. Rate of B: \(1/20 = 0.05\) job per hour.
- Combined rate: \(0.5 + 0.05 = 0.55\) job per hour.
- Time: \(t = \frac{2 \times 20}{2+20}=\frac{40}{22}\approx\)1.82 hours.
- Convert: \(0.818 \times 60 \approx 49\) minutes, so about 1 h 49 min.
The result is just under the faster worker's 2 hours. The slow worker barely helps.
Example 3: Two pipes filling a tank (3 h and 5 h)
- Pipe 1 fills \(1/3\) of the tank per hour. Pipe 2 fills \(1/5\) of the tank per hour.
- Combined rate: \(\frac{1}{3}+\frac{1}{5}=\frac{5}{15}+\frac{3}{15}=\frac{8}{15}\) tank per hour.
- Time: \(t = \frac{3 \times 5}{3+5}=\frac{15}{8}=\)1.875 hours.
- Convert: \(0.875 \times 60 = 52.5\) minutes, so 1 h 52.5 min (1 h 52 min 30 s).
These examples assume both workers or pipes keep a constant rate and do not interfere with each other.
Scenario Comparison
The table shows how the pairing of times changes the combined result. "Time saved" is the faster worker's solo time minus the together time.
| a (h) | b (h) | Together time t (h) | Combined rate (jobs/h) | Time saved vs. faster worker alone (h) |
|---|---|---|---|---|
| 4 | 6 | 2.4 | 0.4167 | 1.6 |
| 6 | 6 | 3 | 0.3333 | 3 |
| 2 | 20 | 1.818 | 0.55 | 0.182 |
| 1 | 10 | 0.909 | 1.1 | 0.091 |
| 10 | 15 | 6 | 0.1667 | 4 |
| 5 | 5 | 2.5 | 0.4 | 2.5 |
Patterns to notice:
- The together time \(t\) is always less than \(\min(a,b)\), because adding any worker adds some positive rate.
- The together time is always more than half of \(\min(a,b)\) unless the workers are equal. When \(a=b\), \(t\) is exactly half of that time, as in (6, 6) and (5, 5).
- The more unequal the pair, the smaller the benefit. For (1, 10) the slower worker saves only about 0.09 h, roughly 5.5 minutes.
FAQ
Does this work for pipes filling a tank? Yes — any additive-rate problem (pipes, pumps, hoses) uses the same formula.
What if one input is zero? A time of zero means an infinitely fast worker, which is not physically meaningful, so use positive times.
Can I extend it to three workers? The same idea applies: \(1/t = 1/a + 1/b + 1/c\). This calculator covers the two-worker case.